Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 6 7 8 9 10 > | ||||||||||||||||||
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008168_004 | Dismissed | Planned | Production unavailability | 2023-07-19T17:39:02+01:00 | 2023-06-03T14:26:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 80 | 0 | 80 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008168_003 | Dismissed | Planned | Production unavailability | 2023-06-23T17:21:18+01:00 | 2023-06-03T14:26:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 80 | 0 | 80 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_003 | Dismissed | Planned | Production unavailability | 2023-04-13T17:36:27+01:00 | 2023-04-23T14:01:00+01:00 | 2023-05-11T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_002 | Dismissed | Planned | Production unavailability | 2023-04-05T16:27:14+01:00 | 2023-04-23T16:01:00+01:00 | 2023-05-11T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008168_002 | Dismissed | Planned | Production unavailability | 2023-06-09T15:37:41+01:00 | 2023-06-03T14:26:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 80 | 0 | 80 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008168_001 | Dismissed | Planned | Production unavailability | 2023-06-03T14:18:18+01:00 | 2023-06-03T14:00:00+01:00 | 2023-06-16T05:59:00+01:00 | MW | 80 | 0 | 80 | Failure | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:37:19+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:23+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:30:23+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 180 | 120 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008408_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:35:54+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 136 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008408_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:49+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 136 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008408_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:29:00+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 138 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008407_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:34:54+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 60 | 40 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008407_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:51:30+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 60 | 40 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008407_001 | Dismissed | Planned | Production unavailability | 2023-09-14T16:27:37+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 60 | 100 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:35+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:23+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:54:18+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:03+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:49+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:48:14+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 140 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:24:56+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:51:30+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:44:02+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:45+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:26:09+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008404_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:21:41+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 92 | 208 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:35+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:25:39+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008403_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:20:18+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 70 | 70 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008402_003 | Dismissed | Planned | Production unavailability | 2023-09-14T17:36:18+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008402_002 | Dismissed | Planned | Production unavailability | 2023-09-14T16:25:07+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-14T17:30:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008402_001 | Dismissed | Planned | Production unavailability | 2023-09-14T12:13:10+01:00 | 2023-09-14T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 80 | 80 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008401_002 | Dismissed | Planned | Production unavailability | 2023-09-14T12:35:09+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 298 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008401_001 | Dismissed | Planned | Production unavailability | 2023-09-13T19:02:02+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 2 | 298 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008400_002 | Dismissed | Planned | Production unavailability | 2023-09-14T12:33:28+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 110 | 30 | 140 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008400_001 | Dismissed | Planned | Production unavailability | 2023-09-13T18:59:58+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 110 | 30 | 140 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008399_002 | Dismissed | Planned | Production unavailability | 2023-09-14T12:32:59+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-14T12:00:00+01:00 | MW | 130 | 30 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008399_001 | Dismissed | Planned | Production unavailability | 2023-09-13T18:55:50+01:00 | 2023-09-13T20:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 130 | 30 | 160 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_004 | Dismissed | Planned | Production unavailability | 2023-09-11T10:46:21+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_003 | Dismissed | Planned | Production unavailability | 2023-09-11T09:49:51+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 120 | 238 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_002 | Dismissed | Planned | Production unavailability | 2023-09-11T09:46:14+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 100 | 258 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_001 | Dismissed | Planned | Production unavailability | 2023-09-11T09:40:28+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 130 | 228 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008352_002 | Inactive | Planned | Production unavailability | 2023-09-01T00:02:31+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 102 | 198 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008347_002 | Inactive | Planned | Production unavailability | 2023-09-01T00:02:31+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008347_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:43:05+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008352_001 | Dismissed | Planned | Production unavailability | 2023-08-25T20:52:29+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 102 | 198 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008351_003 | Inactive | Planned | Production unavailability | 2023-08-31T08:02:32+01:00 | 2023-08-30T23:01:00+01:00 | 2023-08-31T07:00:00+01:00 | MW | 140 | 160 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008351_002 | Dismissed | Planned | Production unavailability | 2023-08-28T20:05:32+01:00 | 2023-08-30T23:01:00+01:00 | 2023-08-31T07:00:00+01:00 | MW | 140 | 160 | 300 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008346_002 | Inactive | Planned | Production unavailability | 2023-08-31T08:02:32+01:00 | 2023-08-30T23:01:00+01:00 | 2023-08-31T07:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |