Last update at: 2023-09-26T18:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 8 9 10 11 12 > | ||||||||||||||||||
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008046_001 | Dismissed | Planned | Production unavailability | 2023-03-28T11:29:23+01:00 | 2023-04-04T09:00:00+01:00 | 2023-04-06T16:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008048_001 | Dismissed | Planned | Production unavailability | 2023-03-28T11:53:02+01:00 | 2023-04-04T09:00:00+01:00 | 2023-04-06T16:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008042_001 | Dismissed | Planned | Production unavailability | 2023-03-27T17:21:04+01:00 | 2023-04-04T09:00:00+01:00 | 2023-04-06T16:00:00+01:00 | MW | 70 | 230 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008044_001 | Dismissed | Planned | Production unavailability | 2023-03-28T09:37:05+01:00 | 2023-04-04T09:00:00+01:00 | 2023-04-06T16:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_013 | Inactive | Planned | Production unavailability | 2023-04-04T10:02:31+01:00 | 2023-03-19T06:00:00+00:00 | 2023-04-04T08:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_012 | Dismissed | Planned | Production unavailability | 2023-03-31T17:41:26+01:00 | 2023-03-19T06:00:00+00:00 | 2023-04-04T08:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_011 | Dismissed | Planned | Production unavailability | 2023-03-28T22:09:51+01:00 | 2023-03-19T06:00:00+00:00 | 2023-04-04T08:59:00+01:00 | MW | 220 | 138 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_010 | Dismissed | Planned | Production unavailability | 2023-03-27T17:03:15+01:00 | 2023-03-19T06:00:00+00:00 | 2023-04-04T08:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_009 | Dismissed | Planned | Production unavailability | 2023-03-17T18:15:47+00:00 | 2023-03-19T06:00:00+00:00 | 2023-05-11T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_008 | Dismissed | Planned | Production unavailability | 2023-03-14T16:13:51+00:00 | 2023-03-19T13:01:00+00:00 | 2023-04-05T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_007 | Dismissed | Planned | Production unavailability | 2023-03-14T14:41:38+00:00 | 2023-03-16T13:01:00+00:00 | 2023-04-05T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007993_007 | Inactive | Planned | Production unavailability | 2023-04-04T10:02:31+01:00 | 2023-03-16T12:01:00+00:00 | 2023-04-04T08:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007993_006 | Dismissed | Planned | Production unavailability | 2023-03-28T11:24:49+01:00 | 2023-03-16T12:01:00+00:00 | 2023-04-04T08:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_006 | Inactive | Planned | Production unavailability | 2023-04-04T10:02:31+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_006 | Dismissed | Planned | Production unavailability | 2023-02-24T17:40:16+00:00 | 2023-03-19T13:01:00+00:00 | 2023-04-05T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_005 | Dismissed | Planned | Production unavailability | 2023-01-12T11:47:29+00:00 | 2023-04-05T06:00:00+01:00 | 2023-05-13T05:59:00+01:00 | MW | 140 | 160 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_005 | Dismissed | Planned | Production unavailability | 2023-03-31T17:42:14+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007993_005 | Dismissed | Planned | Production unavailability | 2023-03-15T15:04:29+00:00 | 2023-03-16T14:51:00+00:00 | 2023-06-13T05:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007993_004 | Dismissed | Planned | Production unavailability | 2023-03-14T14:35:55+00:00 | 2023-03-16T13:01:00+00:00 | 2023-06-13T05:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_004 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:42+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 80 | 278 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_004 | Dismissed | Planned | Production unavailability | 2022-12-21T13:28:25+00:00 | 2023-04-15T06:00:00+01:00 | 2023-05-15T05:59:00+01:00 | MW | 180 | 120 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_003 | Dismissed | Planned | Production unavailability | 2022-12-21T13:14:26+00:00 | 2023-04-15T06:00:00+01:00 | 2023-05-15T05:59:00+01:00 | MW | 190 | 110 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:15:25+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007993_003 | Dismissed | Planned | Production unavailability | 2023-02-25T07:30:35+00:00 | 2023-03-19T13:01:00+00:00 | 2023-06-13T05:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008049_003 | Inactive | Planned | Production unavailability | 2023-04-04T10:02:31+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008049_002 | Dismissed | Planned | Production unavailability | 2023-03-28T14:13:50+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:33:31+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_002 | Dismissed | Planned | Production unavailability | 2022-12-19T16:19:53+00:00 | 2023-04-13T06:00:00+01:00 | 2023-06-09T05:59:00+01:00 | MW | 60 | 240 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007705_001 | Dismissed | Planned | Production unavailability | 2022-11-04T13:38:12+00:00 | 2023-04-09T06:00:00+01:00 | 2023-06-07T05:59:00+01:00 | MW | 60 | 240 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008028_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:43:51+00:00 | 2023-04-02T12:00:00+01:00 | 2023-04-17T05:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008049_001 | Dismissed | Planned | Production unavailability | 2023-03-28T11:55:54+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-04T08:59:00+01:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_006 | Inactive | Planned | Production unavailability | 2023-04-02T13:32:32+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_005 | Dismissed | Planned | Production unavailability | 2023-03-31T17:41:50+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_004 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:19+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:16:40+01:00 | 2023-03-31T14:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:23:16+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008026_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:38:31+00:00 | 2023-04-02T12:00:00+01:00 | 2023-04-02T12:30:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008030_002 | Dismissed | Planned | Production unavailability | 2023-04-01T01:12:20+01:00 | 2023-04-02T12:00:00+01:00 | 2023-04-29T11:59:00+01:00 | MW | 210 | 148 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008030_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:52:16+00:00 | 2023-04-02T12:00:00+01:00 | 2023-04-29T11:59:00+01:00 | MW | 210 | 148 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_007 | Inactive | Planned | Production unavailability | 2023-03-31T17:02:32+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_007 | Inactive | Planned | Production unavailability | 2023-03-31T17:02:32+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 80 | 278 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_007 | Inactive | Planned | Production unavailability | 2023-03-31T17:02:32+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_006 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:19+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 220 | 220 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_006 | Dismissed | Planned | Production unavailability | 2023-03-28T22:10:42+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 80 | 278 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_006 | Dismissed | Planned | Production unavailability | 2023-03-28T14:25:51+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_005 | Dismissed | Planned | Production unavailability | 2023-03-28T14:23:13+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_005 | Dismissed | Planned | Production unavailability | 2023-03-28T14:26:46+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_005 | Dismissed | Planned | Production unavailability | 2023-03-28T14:27:08+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T15:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_004 | Dismissed | Planned | Production unavailability | 2023-03-28T14:22:40+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_004 | Dismissed | Planned | Production unavailability | 2023-03-28T14:22:57+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |