This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2023-01-30T07:00:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002962_004 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2021-07-16T00:00:00+01:00 2021-07-23T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002961_004 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2021-04-23T00:00:00+01:00 2021-04-26T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002965_004 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-04-18T00:00:00+01:00 2020-04-21T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002960_004 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2021-01-23T00:00:00+00:00 2021-01-26T00:00:00+00:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002959_005 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-07-11T00:00:00+01:00 2020-07-27T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FIDL-2 48W000000FIDL-24
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003258_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-04-03T23:00:00+01:00 2020-06-26T14:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-1 48W000000FIDL-16
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003257_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-04-14T23:00:00+01:00 2020-05-17T14:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003280_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-09-04T23:00:00+01:00 2020-09-08T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003260_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-07-09T23:00:00+01:00 2020-07-23T14:00:00+01:00 MW 506 0 506 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-3 48W000000FIDL-32
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003259_004 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-07-02T23:00:00+01:00 2020-07-16T14:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003361_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-10-10T00:00:00+01:00 2020-10-13T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003362_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-04-22T00:00:00+01:00 2022-04-25T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003363_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-07-08T00:00:00+01:00 2022-07-18T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003365_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2023-01-20T00:00:00+00:00 2023-01-23T00:00:00+00:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003364_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-10-14T00:00:00+01:00 2022-10-17T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-07-03T23:00:00+01:00 2020-07-10T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-05-22T23:00:00+01:00 2020-05-29T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003402_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2021-04-09T23:00:00+01:00 2021-06-01T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-04-08T23:00:00+01:00 2022-04-15T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-04-29T23:00:00+01:00 2022-05-06T23:00:00+01:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-05-13T23:00:00+01:00 2022-05-20T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003406_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2022-09-13T23:00:00+01:00 2022-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003513_001 Dismissed Planned Production unavailability 2017-12-06T17:32:01+00:00 2020-12-04T23:00:00+00:00 2020-12-08T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003316_004 Dismissed Planned Production unavailability 2018-01-08T15:52:26+00:00 2021-09-06T08:00:00+01:00 2021-09-26T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003317_004 Dismissed Planned Production unavailability 2018-01-08T15:52:56+00:00 2021-09-20T08:00:00+01:00 2021-10-10T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003593_001 Dismissed Planned Production unavailability 2018-01-09T14:21:00+00:00 2022-09-05T08:00:00+01:00 2022-09-25T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_001 Dismissed Planned Production unavailability 2018-01-09T14:22:07+00:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003599_001 Dismissed Planned Production unavailability 2018-01-10T14:29:16+00:00 2023-09-04T08:00:00+01:00 2023-09-24T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003600_001 Dismissed Planned Production unavailability 2018-01-10T14:30:15+00:00 2023-09-18T08:00:00+01:00 2023-10-08T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FIDL-1 48W000000FIDL-16
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003624_001 Dismissed Planned Production unavailability 2018-02-09T07:36:57+00:00 2020-04-01T00:00:00+01:00 2050-12-31T23:59:59+00:00 MW 485 0 485 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-2 48W000000FIDL-24
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003625_001 Dismissed Planned Production unavailability 2018-02-09T07:38:26+00:00 2020-04-01T00:00:00+01:00 2050-12-31T23:59:59+00:00 MW 485 0 485 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-3 48W000000FIDL-32
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003626_001 Dismissed Planned Production unavailability 2018-02-09T07:40:14+00:00 2020-04-01T00:00:00+01:00 2050-12-31T23:59:59+00:00 MW 485 0 485 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003627_001 Dismissed Planned Production unavailability 2018-02-09T07:41:51+00:00 2020-04-01T00:00:00+01:00 2050-12-31T23:59:59+00:00 MW 506 0 506 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-1 48W000000FIDL-16
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003257_004 Dismissed Planned Production unavailability 2018-02-09T11:46:48+00:00 2020-04-14T23:00:00+01:00 2020-05-17T14:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-2 48W000000FIDL-24
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003258_004 Dismissed Planned Production unavailability 2018-02-09T11:47:30+00:00 2020-04-03T23:00:00+01:00 2020-06-26T14:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-3 48W000000FIDL-32
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003259_005 Dismissed Planned Production unavailability 2018-02-09T11:48:33+00:00 2020-07-02T23:00:00+01:00 2020-07-16T14:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003260_004 Dismissed Planned Production unavailability 2018-02-09T11:49:17+00:00 2020-07-09T23:00:00+01:00 2020-07-23T14:00:00+01:00 MW 506 0 506 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003630_001 Dismissed Planned Production unavailability 2018-02-12T08:30:12+00:00 2021-03-04T23:00:00+00:00 2021-03-08T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_005 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2020-06-05T23:00:00+01:00 2020-07-19T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003170_005 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2020-06-15T08:00:00+01:00 2020-08-21T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003169_005 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2020-04-06T08:00:00+01:00 2020-06-12T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FERR-4 48W000000FERR-44
KEADBY GEN. LTD
48X000000000073U 0000000000000000000001025_006 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2015-05-20T07:00:00+01:00 2050-01-01T00:00:00+00:00 MW 490 0 490 Shutdown
Maintenance
Fossil Hard coal 10YGB----------A
T_FERR-3 48W000000FERR-36
KEADBY GEN. LTD
48X000000000073U 0000000000000000000001023_007 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2016-03-23T13:00:00+00:00 2050-01-01T00:00:00+00:00 MW 490 0 490 Shutdown
Maintenance
Fossil Hard coal 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000003318_004 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2021-04-05T08:00:00+01:00 2021-04-16T16:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003316_005 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2021-09-06T08:00:00+01:00 2021-09-26T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_002 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003593_002 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2022-09-05T08:00:00+01:00 2022-09-25T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003317_005 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2021-09-20T08:00:00+01:00 2021-10-10T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A