Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008851_002 | Dismissed | Planned | Production unavailability | 2024-02-15T15:39:56+00:00 | 2024-02-15T15:10:00+00:00 | 2024-02-15T15:30:00+00:00 | MW | 0 | 0 | 0 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008851_001 | Dismissed | Planned | Production unavailability | 2024-02-15T15:10:53+00:00 | 2024-02-15T15:10:00+00:00 | 2024-02-15T15:30:00+00:00 | MW | 0 | 0 | 0 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Dogger Bank A |
48X0000000003113 | 0000000000000000000007762_002 | Dismissed | Planned | Production unavailability | 2022-12-06T13:07:11+00:00 | 2022-12-06T12:40:00+00:00 | 2022-12-06T12:50:00+00:00 | MW | 0 | 0 | 0 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Dogger Bank A |
48X0000000003113 | 0000000000000000000007762_001 | Dismissed | Planned | Production unavailability | 2022-12-06T12:40:43+00:00 | 2022-12-06T12:40:00+00:00 | 2022-12-06T12:50:00+00:00 | MW | 0 | 0 | 0 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009028_002 | Dismissed | Planned | Production unavailability | 2024-04-17T16:54:52+01:00 | 2024-04-17T16:45:00+01:00 | 2024-04-17T16:50:00+01:00 | MW | 0 | 9 | 9 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009028_001 | Dismissed | Planned | Production unavailability | 2024-04-17T16:43:16+01:00 | 2024-04-17T16:45:00+01:00 | 2024-04-17T16:50:00+01:00 | MW | 9 | 0 | 9 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009021_003 | Dismissed | Planned | Production unavailability | 2024-04-16T14:05:58+01:00 | 2024-04-16T13:00:00+01:00 | 2024-04-16T14:00:00+01:00 | MW | 0 | 10 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009021_002 | Dismissed | Planned | Production unavailability | 2024-04-16T13:33:19+01:00 | 2024-04-16T13:00:00+01:00 | 2024-04-16T14:00:00+01:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009021_001 | Dismissed | Planned | Production unavailability | 2024-04-16T13:00:49+01:00 | 2024-04-16T13:00:00+01:00 | 2024-04-16T13:30:00+01:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_003 | Dismissed | Planned | Production unavailability | 2024-03-22T11:46:50+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:30:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_002 | Dismissed | Planned | Production unavailability | 2024-03-22T11:10:29+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:30:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_001 | Dismissed | Planned | Production unavailability | 2024-03-22T10:24:43+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008915_002 | Dismissed | Planned | Production unavailability | 2024-03-06T17:00:02+00:00 | 2024-03-06T16:30:00+00:00 | 2024-03-06T17:00:00+00:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008915_001 | Dismissed | Planned | Production unavailability | 2024-03-06T16:27:55+00:00 | 2024-03-06T16:30:00+00:00 | 2024-03-06T17:00:00+00:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_003 | Dismissed | Planned | Production unavailability | 2024-02-26T15:27:37+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T15:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_002 | Dismissed | Planned | Production unavailability | 2024-02-26T10:19:17+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T15:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_001 | Dismissed | Planned | Production unavailability | 2024-02-26T09:38:02+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T10:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008852_002 | Dismissed | Planned | Production unavailability | 2024-02-15T16:30:32+00:00 | 2024-02-15T15:31:00+00:00 | 2024-02-15T15:51:00+00:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008852_001 | Dismissed | Planned | Production unavailability | 2024-02-15T15:32:03+00:00 | 2024-02-15T15:31:00+00:00 | 2024-02-15T15:51:00+00:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_003 | Dismissed | Planned | Production unavailability | 2024-03-17T17:49:29+00:00 | 2024-03-18T08:00:00+00:00 | 2024-03-25T10:10:00+00:00 | MW | 26 | 0 | 26 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008871_009 | Inactive | Planned | Production unavailability | 2024-03-18T09:02:32+00:00 | 2024-03-04T10:00:00+00:00 | 2024-03-18T08:00:00+00:00 | MW | 26 | 0 | 26 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008871_008 | Dismissed | Planned | Production unavailability | 2024-03-17T17:49:29+00:00 | 2024-03-04T10:00:00+00:00 | 2024-03-18T08:00:00+00:00 | MW | 26 | 0 | 26 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009023_002 | Active | Unplanned | Production unavailability | 2024-04-17T14:46:09+01:00 | 2024-04-16T18:00:00+01:00 | 2024-04-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009023_001 | Dismissed | Unplanned | Production unavailability | 2024-04-16T18:04:15+01:00 | 2024-04-16T18:00:00+01:00 | 2024-04-17T17:00:00+01:00 | MW | 52 | 0 | 52 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009022_002 | Active | Unplanned | Production unavailability | 2024-04-17T14:41:10+01:00 | 2024-04-16T16:19:00+01:00 | 2024-04-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009022_001 | Dismissed | Unplanned | Production unavailability | 2024-04-16T16:20:43+01:00 | 2024-04-16T16:19:00+01:00 | 2024-04-17T17:00:00+01:00 | MW | 52 | 0 | 52 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008849_005 | Inactive | Planned | Production unavailability | 2024-04-16T18:02:31+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-16T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008849_004 | Dismissed | Planned | Production unavailability | 2024-04-15T16:49:30+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-16T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008849_003 | Dismissed | Planned | Production unavailability | 2024-04-12T15:40:47+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-15T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008849_002 | Dismissed | Planned | Production unavailability | 2024-04-10T11:12:51+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-12T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008849_001 | Dismissed | Planned | Production unavailability | 2024-02-14T13:58:02+00:00 | 2024-03-18T09:00:00+00:00 | 2024-04-10T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008848_006 | Inactive | Planned | Production unavailability | 2024-04-16T16:47:31+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-16T15:40:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008848_005 | Dismissed | Planned | Production unavailability | 2024-04-16T15:36:26+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-16T15:40:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008848_004 | Dismissed | Planned | Production unavailability | 2024-04-15T16:50:15+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-16T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008848_003 | Dismissed | Planned | Production unavailability | 2024-04-12T15:40:03+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-15T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008848_002 | Dismissed | Planned | Production unavailability | 2024-04-10T11:06:19+01:00 | 2024-03-18T09:00:00+00:00 | 2024-04-12T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008848_001 | Dismissed | Planned | Production unavailability | 2024-02-14T13:55:40+00:00 | 2024-03-18T09:00:00+00:00 | 2024-04-10T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Grid |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_009 | Inactive | Planned | Production unavailability | 2024-04-12T12:47:32+01:00 | 2024-01-23T10:00:00+00:00 | 2024-04-12T11:40:00+01:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_008 | Dismissed | Planned | Production unavailability | 2024-04-12T11:36:40+01:00 | 2024-01-23T10:00:00+00:00 | 2024-04-12T11:40:00+01:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_007 | Dismissed | Planned | Production unavailability | 2024-03-27T11:50:42+00:00 | 2024-01-23T10:00:00+00:00 | 2024-04-12T17:00:00+01:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_006 | Dismissed | Planned | Production unavailability | 2024-03-14T09:18:29+00:00 | 2024-01-23T10:00:00+00:00 | 2024-03-29T17:00:00+00:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_005 | Dismissed | Planned | Production unavailability | 2024-03-13T22:55:04+00:00 | 2024-01-23T10:00:00+00:00 | 2024-05-15T00:00:00+01:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_004 | Dismissed | Planned | Production unavailability | 2024-02-09T09:59:42+00:00 | 2024-01-23T10:00:00+00:00 | 2024-03-15T00:00:00+00:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_003 | Dismissed | Planned | Production unavailability | 2024-01-23T09:58:32+00:00 | 2024-01-23T10:00:00+00:00 | 2024-02-29T17:00:00+00:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_002 | Dismissed | Planned | Production unavailability | 2024-01-22T13:32:41+00:00 | 2024-06-29T09:00:00+01:00 | 2024-07-05T17:00:00+01:00 | MW | 26 | 26 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_001 | Dismissed | Planned | Production unavailability | 2023-11-27T12:35:21+00:00 | 2024-06-29T09:00:00+01:00 | 2024-07-05T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008997_001 | Active | Planned | Production unavailability | 2024-04-08T15:36:38+01:00 | 2027-06-21T00:00:00+01:00 | 2027-06-28T00:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008996_001 | Active | Planned | Production unavailability | 2024-04-08T15:34:58+01:00 | 2027-06-14T00:00:00+01:00 | 2027-06-21T00:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008995_001 | Active | Planned | Production unavailability | 2024-04-08T15:32:49+01:00 | 2027-05-17T00:00:00+01:00 | 2027-05-28T00:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008994_001 | Active | Planned | Production unavailability | 2024-04-08T15:31:01+01:00 | 2027-05-17T00:00:00+01:00 | 2027-05-28T00:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |