Last update at: 2024-03-28T21:00:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 4 5 6 7 8 > | ||||||||||||||||||
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008655_002 | Inactive | Planned | Production unavailability | 2023-12-05T22:02:33+00:00 | 2023-12-05T15:31:00+00:00 | 2023-12-05T21:00:00+00:00 | MW | 300 | 0 | 300 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008577_002 | Inactive | Planned | Production unavailability | 2023-12-05T17:32:35+00:00 | 2023-12-05T08:00:00+00:00 | 2023-12-05T16:30:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008578_002 | Inactive | Planned | Consumption unavailability | 2023-12-05T17:32:35+00:00 | 2023-12-05T08:00:00+00:00 | 2023-12-05T16:30:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008660_005 | Inactive | Unplanned | Production unavailability | 2023-12-05T16:32:32+00:00 | 2023-12-05T10:28:00+00:00 | 2023-12-05T15:30:00+00:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008632_005 | Inactive | Planned | Production unavailability | 2023-12-05T10:02:33+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-05T09:00:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008617_003 | Inactive | Planned | Production unavailability | 2023-12-05T10:02:33+00:00 | 2023-12-04T09:00:00+00:00 | 2023-12-05T09:00:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008622_004 | Inactive | Planned | Production unavailability | 2023-12-04T23:02:31+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-04T22:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008649_002 | Inactive | Planned | Production unavailability | 2023-12-04T01:02:32+00:00 | 2023-11-29T00:00:00+00:00 | 2023-12-04T00:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008616_004 | Inactive | Planned | Production unavailability | 2023-12-03T17:32:32+00:00 | 2023-12-03T08:01:00+00:00 | 2023-12-03T16:25:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008614_004 | Inactive | Planned | Production unavailability | 2023-12-03T17:32:32+00:00 | 2023-12-03T08:01:00+00:00 | 2023-12-03T16:25:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008621_005 | Inactive | Planned | Production unavailability | 2023-12-02T19:02:33+00:00 | 2023-12-02T09:50:00+00:00 | 2023-12-02T18:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008652_003 | Inactive | Unplanned | Production unavailability | 2023-12-01T09:17:32+00:00 | 2023-12-01T06:24:00+00:00 | 2023-12-01T08:12:00+00:00 | MW | 0 | 52 | 52 | Failure | Plant Fault - Control System |
Fossil Gas | 10Y1001A1001A59C |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008651_003 | Inactive | Unplanned | Production unavailability | 2023-12-01T03:02:32+00:00 | 2023-12-01T01:00:00+00:00 | 2023-12-01T02:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Turbine |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008650_003 | Inactive | Unplanned | Consumption unavailability | 2023-12-01T03:02:32+00:00 | 2023-12-01T01:00:00+00:00 | 2023-12-01T02:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Turbine |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008647_003 | Inactive | Planned | Production unavailability | 2023-11-30T16:02:32+00:00 | 2023-11-30T13:00:00+00:00 | 2023-11-30T15:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008648_003 | Inactive | Planned | Consumption unavailability | 2023-11-30T16:02:32+00:00 | 2023-11-30T13:00:00+00:00 | 2023-11-30T15:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008529_005 | Inactive | Planned | Production unavailability | 2023-11-28T19:32:32+00:00 | 2023-11-28T09:01:00+00:00 | 2023-11-28T18:30:00+00:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008530_005 | Inactive | Planned | Production unavailability | 2023-11-28T19:32:32+00:00 | 2023-11-28T09:01:00+00:00 | 2023-11-28T18:30:00+00:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008531_005 | Inactive | Planned | Production unavailability | 2023-11-28T19:32:32+00:00 | 2023-11-28T09:01:00+00:00 | 2023-11-28T18:30:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_044 | Inactive | Planned | Production unavailability | 2023-11-28T19:02:32+00:00 | 2023-10-18T09:08:00+01:00 | 2023-11-28T18:00:00+00:00 | MW | 289 | 13 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008640_002 | Inactive | Unplanned | Production unavailability | 2023-11-27T12:02:32+00:00 | 2023-11-27T04:55:00+00:00 | 2023-11-27T11:00:00+00:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008639_002 | Inactive | Planned | Production unavailability | 2023-11-26T15:32:32+00:00 | 2023-11-26T13:30:00+00:00 | 2023-11-26T14:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008638_002 | Inactive | Planned | Production unavailability | 2023-11-26T13:32:32+00:00 | 2023-11-26T11:30:00+00:00 | 2023-11-26T12:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008637_002 | Inactive | Planned | Production unavailability | 2023-11-26T11:32:32+00:00 | 2023-11-26T09:00:00+00:00 | 2023-11-26T10:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008630_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:17:31+00:00 | 2023-11-25T18:56:00+00:00 | 2023-11-25T19:05:00+00:00 | MW | 210 | 500 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008631_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:17:31+00:00 | 2023-11-25T19:06:00+00:00 | 2023-11-25T19:15:00+00:00 | MW | 100 | 610 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008636_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:02:31+00:00 | 2023-11-25T17:20:00+00:00 | 2023-11-25T19:00:00+00:00 | MW | 140 | 700 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008629_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:02:31+00:00 | 2023-11-25T18:46:00+00:00 | 2023-11-25T18:55:00+00:00 | MW | 310 | 400 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008627_002 | Inactive | Planned | Production unavailability | 2023-11-25T19:47:31+00:00 | 2023-11-25T18:26:00+00:00 | 2023-11-25T18:35:00+00:00 | MW | 510 | 200 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008628_002 | Inactive | Planned | Production unavailability | 2023-11-25T19:47:31+00:00 | 2023-11-25T18:36:00+00:00 | 2023-11-25T18:45:00+00:00 | MW | 410 | 300 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_009 | Inactive | Planned | Consumption unavailability | 2023-11-25T19:32:31+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-25T18:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_008 | Inactive | Planned | Consumption unavailability | 2023-11-25T19:32:31+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-25T18:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008626_002 | Inactive | Planned | Production unavailability | 2023-11-25T19:32:31+00:00 | 2023-11-25T18:16:00+00:00 | 2023-11-25T18:25:00+00:00 | MW | 610 | 100 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008625_002 | Inactive | Planned | Production unavailability | 2023-11-25T19:17:31+00:00 | 2023-11-25T17:16:00+00:00 | 2023-11-25T18:15:00+00:00 | MW | 680 | 30 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008611_004 | Inactive | Planned | Production unavailability | 2023-11-25T18:32:31+00:00 | 2023-11-25T16:30:00+00:00 | 2023-11-25T17:20:00+00:00 | MW | 340 | 500 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008624_002 | Inactive | Unplanned | Production unavailability | 2023-11-25T18:17:31+00:00 | 2023-11-25T15:14:00+00:00 | 2023-11-25T17:15:00+00:00 | MW | 710 | 0 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008610_008 | Inactive | Planned | Production unavailability | 2023-11-25T17:32:31+00:00 | 2023-11-25T15:45:00+00:00 | 2023-11-25T16:30:00+00:00 | MW | 590 | 250 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008609_007 | Inactive | Planned | Production unavailability | 2023-11-25T16:47:31+00:00 | 2023-11-25T13:00:00+00:00 | 2023-11-25T15:45:00+00:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008597_006 | Inactive | Planned | Production unavailability | 2023-11-25T14:02:32+00:00 | 2023-11-25T10:30:00+00:00 | 2023-11-25T13:00:00+00:00 | MW | 670 | 170 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008613_002 | Inactive | Planned | Production unavailability | 2023-11-25T10:47:32+00:00 | 2023-11-25T08:45:00+00:00 | 2023-11-25T09:45:00+00:00 | MW | 440 | 400 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008612_001 | Inactive | Planned | Production unavailability | 2023-11-25T08:55:30+00:00 | 2023-11-25T08:00:00+00:00 | 2023-11-25T08:45:00+00:00 | MW | 290 | 550 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008600_003 | Inactive | Planned | Production unavailability | 2023-11-24T19:17:32+00:00 | 2023-11-24T08:00:00+00:00 | 2023-11-24T18:15:00+00:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008605_003 | Inactive | Planned | Production unavailability | 2023-11-24T19:02:32+00:00 | 2023-11-24T17:30:00+00:00 | 2023-11-24T18:00:00+00:00 | MW | 475 | 365 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008604_002 | Inactive | Planned | Production unavailability | 2023-11-24T15:32:32+00:00 | 2023-11-24T12:30:00+00:00 | 2023-11-24T14:30:00+00:00 | MW | 90 | 750 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008591_002 | Inactive | Planned | Production unavailability | 2023-11-24T14:02:32+00:00 | 2023-11-24T12:00:00+00:00 | 2023-11-24T13:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008592_002 | Inactive | Planned | Consumption unavailability | 2023-11-24T14:02:32+00:00 | 2023-11-24T12:00:00+00:00 | 2023-11-24T13:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008603_002 | Inactive | Planned | Production unavailability | 2023-11-24T13:32:32+00:00 | 2023-11-24T09:25:00+00:00 | 2023-11-24T12:30:00+00:00 | MW | 240 | 600 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008570_005 | Inactive | Planned | Production unavailability | 2023-11-24T12:32:31+00:00 | 2023-11-23T07:00:00+00:00 | 2023-11-24T11:30:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008571_005 | Inactive | Planned | Production unavailability | 2023-11-24T12:32:31+00:00 | 2023-11-23T07:00:00+00:00 | 2023-11-24T11:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008590_002 | Inactive | Planned | Production unavailability | 2023-11-24T09:02:31+00:00 | 2023-11-23T22:00:00+00:00 | 2023-11-24T08:00:00+00:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |