Last update at: 2019-08-22T20:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004593_003 Active Unplanned Production unavailability 2019-08-22T16:32:49+01:00 2019-08-22T15:55:00+01:00 2019-08-23T16:30:00+01:00 MW 710 0 710 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_FIDL-2 48W000000FIDL-24
KEADBY GEN. LTD
48X000000000073U 0000000000000000000004364_001 Active Planned Production unavailability 2019-06-13T15:18:09+01:00 2019-08-24T05:00:00+01:00 2019-09-09T17:00:00+01:00 MW 485 0 485 Foreseen Maintenance
Planned Outage
Fossil Hard coal 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004363_001 Active Planned Production unavailability 2019-06-11T12:54:11+01:00 2022-09-08T23:00:00+01:00 2022-09-12T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004362_001 Active Planned Production unavailability 2019-06-11T12:50:58+01:00 2022-06-10T23:00:00+01:00 2022-06-28T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000004274_001 Active Planned Production unavailability 2019-05-23T14:32:04+01:00 2019-11-01T09:00:00+00:00 2020-05-08T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000004273_001 Active Planned Production unavailability 2019-05-23T14:30:29+01:00 2019-11-01T09:00:00+00:00 2020-05-08T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Planned Outage
Hydro Pumped Storage 10YGB----------A
T_FIDL-1 48W000000FIDL-16
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003624_008 Active Planned Production unavailability 2019-03-19T12:53:02+00:00 2019-03-19T12:55:00+00:00 2050-12-31T23:59:59+00:00 MW 485 0 485 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004082_001 Active Planned Production unavailability 2019-01-28T09:41:24+00:00 2022-03-04T23:00:00+00:00 2022-03-08T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Operational Activities
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003404_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-12-14T23:00:00+00:00 2021-12-21T23:00:00+00:00 MW 400 780 1180 Shutdown
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003405_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2022-03-11T23:00:00+00:00 2022-03-18T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003403_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-08-19T23:00:00+01:00 2021-08-26T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003400_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-02-21T23:00:00+00:00 2020-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003399_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2019-12-06T23:00:00+00:00 2019-12-13T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003398_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2019-10-25T23:00:00+01:00 2019-11-01T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003630_005 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-03-04T23:00:00+00:00 2021-03-08T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FIDL-4 48W000000FIDL-40
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003627_005 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-04-01T00:00:00+01:00 2050-12-31T23:59:59+00:00 MW 506 0 506 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-3 48W000000FIDL-32
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003626_005 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-04-01T00:00:00+01:00 2050-12-31T23:59:59+00:00 MW 485 0 485 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_FIDL-2 48W000000FIDL-24
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003625_005 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-04-01T00:00:00+01:00 2050-12-31T23:59:59+00:00 MW 485 0 485 Shutdown
Planned Outage
Fossil Hard coal 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003513_005 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-12-04T23:00:00+00:00 2020-12-08T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003438_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2019-09-05T23:00:00+01:00 2019-09-09T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003431_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2019-10-12T00:00:00+01:00 2019-10-15T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003406_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2022-09-13T23:00:00+01:00 2022-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003402_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-04-09T23:00:00+01:00 2021-06-01T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003364_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2022-10-14T00:00:00+01:00 2022-10-17T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003365_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2023-01-20T00:00:00+00:00 2023-01-23T00:00:00+00:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003363_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2022-07-08T00:00:00+01:00 2022-07-18T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003362_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2022-04-22T00:00:00+01:00 2022-04-25T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000003361_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-10-10T00:00:00+01:00 2020-10-13T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003280_007 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-09-04T23:00:00+01:00 2020-09-08T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002958_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-01-25T00:00:00+00:00 2020-01-28T00:00:00+00:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002959_009 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-07-11T00:00:00+01:00 2020-07-27T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002960_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-01-23T00:00:00+00:00 2021-01-26T00:00:00+00:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002961_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-04-23T00:00:00+01:00 2021-04-26T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002962_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-07-16T00:00:00+01:00 2021-07-23T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002963_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2021-10-09T00:00:00+01:00 2021-10-12T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002964_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2022-01-28T00:00:00+00:00 2022-01-31T00:00:00+00:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000002965_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-04-18T00:00:00+01:00 2020-04-21T00:00:00+01:00 MW 755 0 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000002944_010 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2019-12-05T23:00:00+00:00 2019-12-09T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003129_008 Active Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-03-05T23:00:00+00:00 2020-03-09T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003880_005 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2021-09-03T23:00:00+01:00 2021-09-07T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000004012_002 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2021-12-03T23:00:00+00:00 2021-12-07T06:00:00+00:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_006 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003599_006 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2023-09-04T08:00:00+01:00 2023-09-24T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003600_006 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2023-09-18T08:00:00+01:00 2023-10-08T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003815_005 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2021-06-11T23:00:00+01:00 2021-06-21T12:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003316_009 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2021-09-06T08:00:00+01:00 2021-09-26T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003317_009 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2021-09-20T08:00:00+01:00 2021-10-10T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000003593_006 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2022-09-05T08:00:00+01:00 2022-09-25T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FERR-4 48W000000FERR-44
KEADBY GEN. LTD
48X000000000073U 0000000000000000000001025_010 Active Planned Production unavailability 2019-01-25T14:03:35+00:00 2015-05-20T07:00:00+01:00 2050-01-01T00:00:00+00:00 MW 490 0 490 Shutdown
Maintenance
Fossil Hard coal 10YGB----------A