Last update at: 2024-04-19T21:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009029_005 Active Unplanned Consumption unavailability 2024-04-19T20:49:25+01:00 2024-04-19T03:19:00+01:00 2024-04-20T08:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009029_004 Dismissed Unplanned Consumption unavailability 2024-04-19T15:23:21+01:00 2024-04-19T03:19:00+01:00 2024-04-19T22:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009029_003 Dismissed Unplanned Consumption unavailability 2024-04-19T09:19:53+01:00 2024-04-19T03:19:00+01:00 2024-04-19T18:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009029_002 Dismissed Unplanned Consumption unavailability 2024-04-19T07:34:28+01:00 2024-04-19T03:19:00+01:00 2024-04-19T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009029_001 Dismissed Unplanned Consumption unavailability 2024-04-19T03:20:33+01:00 2024-04-19T03:19:00+01:00 2024-04-19T08:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009022_003 Active Unplanned Production unavailability 2024-04-19T15:21:57+01:00 2024-04-19T15:19:00+01:00 2024-04-22T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009022_002 Dismissed Unplanned Production unavailability 2024-04-17T14:41:10+01:00 2024-04-16T16:19:00+01:00 2024-04-19T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009022_001 Dismissed Unplanned Production unavailability 2024-04-16T16:20:43+01:00 2024-04-16T16:19:00+01:00 2024-04-17T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009023_003 Active Unplanned Production unavailability 2024-04-19T15:18:09+01:00 2024-04-19T15:13:00+01:00 2024-04-22T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009023_002 Dismissed Unplanned Production unavailability 2024-04-17T14:46:09+01:00 2024-04-16T18:00:00+01:00 2024-04-19T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009023_001 Dismissed Unplanned Production unavailability 2024-04-16T18:04:15+01:00 2024-04-16T18:00:00+01:00 2024-04-17T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_004 Dismissed Planned Production unavailability 2024-04-19T13:08:40+01:00 2024-04-11T08:30:00+01:00 2024-04-23T09:00:00+01:00 MW 157 0 157 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_034 Dismissed Planned Production unavailability 2024-04-19T13:07:03+01:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_033 Dismissed Planned Production unavailability 2024-04-19T13:04:31+01:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_031 Dismissed Planned Production unavailability 2024-04-19T13:02:21+01:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_030 Dismissed Planned Production unavailability 2024-03-22T08:16:23+00:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_029 Dismissed Planned Production unavailability 2024-03-22T07:35:55+00:00 2023-07-18T14:00:00+01:00 2024-11-11T09:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_028 Dismissed Planned Production unavailability 2024-03-22T07:33:55+00:00 2023-07-18T14:00:00+01:00 2025-01-08T09:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_027 Dismissed Planned Production unavailability 2024-03-19T12:11:06+00:00 2023-07-18T14:00:00+01:00 2024-10-11T09:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_026 Dismissed Planned Production unavailability 2024-02-21T13:57:18+00:00 2023-07-18T14:00:00+01:00 2024-10-07T09:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_025 Dismissed Planned Production unavailability 2024-01-10T12:56:50+00:00 2023-07-18T14:00:00+01:00 2024-09-14T09:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_024 Dismissed Planned Production unavailability 2023-11-07T13:10:23+00:00 2023-07-18T14:00:00+01:00 2024-08-17T00:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_023 Dismissed Planned Production unavailability 2023-09-28T14:43:55+01:00 2023-07-18T14:00:00+01:00 2024-07-24T00:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_022 Dismissed Planned Production unavailability 2023-09-28T14:30:35+01:00 2023-07-18T14:00:00+01:00 2023-09-29T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_021 Dismissed Planned Production unavailability 2023-09-27T15:22:28+01:00 2023-07-18T14:00:00+01:00 2023-09-28T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_020 Dismissed Planned Production unavailability 2023-09-26T15:41:35+01:00 2023-07-18T14:00:00+01:00 2023-09-27T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_019 Dismissed Planned Production unavailability 2023-09-25T17:40:25+01:00 2023-07-18T14:00:00+01:00 2023-09-27T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_018 Dismissed Planned Production unavailability 2023-09-23T12:49:34+01:00 2023-07-18T14:00:00+01:00 2023-09-26T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_017 Dismissed Planned Production unavailability 2023-09-22T17:39:07+01:00 2023-07-18T14:00:00+01:00 2023-09-23T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_016 Dismissed Planned Production unavailability 2023-09-19T18:29:26+01:00 2023-07-18T14:00:00+01:00 2023-09-23T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_015 Dismissed Planned Production unavailability 2023-09-18T17:40:03+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_014 Dismissed Planned Production unavailability 2023-09-17T18:17:56+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_013 Dismissed Planned Production unavailability 2023-09-14T21:25:51+01:00 2023-07-18T14:00:00+01:00 2023-09-18T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_012 Dismissed Planned Production unavailability 2023-09-12T08:42:35+01:00 2023-07-18T14:00:00+01:00 2023-09-15T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_011 Dismissed Planned Production unavailability 2023-09-05T17:39:29+01:00 2023-07-18T14:00:00+01:00 2023-09-13T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_010 Dismissed Planned Production unavailability 2023-08-30T16:04:51+01:00 2023-07-18T14:00:00+01:00 2023-09-06T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_009 Dismissed Planned Production unavailability 2023-08-25T10:10:26+01:00 2023-07-18T14:00:00+01:00 2023-08-31T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_008 Dismissed Planned Production unavailability 2023-08-22T11:17:03+01:00 2023-07-18T14:00:00+01:00 2023-08-28T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_007 Dismissed Planned Production unavailability 2023-08-18T09:14:39+01:00 2023-07-18T14:00:00+01:00 2023-08-23T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_006 Dismissed Planned Production unavailability 2023-08-14T14:36:20+01:00 2023-07-18T14:00:00+01:00 2023-08-20T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_005 Dismissed Planned Production unavailability 2023-08-09T17:28:26+01:00 2023-07-18T14:00:00+01:00 2023-08-15T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_004 Dismissed Planned Production unavailability 2023-08-04T15:44:28+01:00 2023-07-18T14:00:00+01:00 2023-08-11T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_003 Dismissed Planned Production unavailability 2023-07-28T15:57:12+01:00 2023-07-18T14:00:00+01:00 2023-08-07T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_002 Dismissed Planned Production unavailability 2023-07-24T10:48:23+01:00 2023-07-18T14:00:00+01:00 2023-08-02T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_001 Dismissed Planned Production unavailability 2023-07-18T13:52:45+01:00 2023-07-18T14:00:00+01:00 2023-07-28T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-4 48W00000DBAWO-4D
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008255_032 Dismissed Planned Production unavailability 2024-04-19T13:06:53+01:00 2023-07-18T14:00:00+01:00 2024-06-05T09:00:00+01:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-4 48W00000DBAWO-4D
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008255_031 Dismissed Planned Production unavailability 2024-04-19T13:04:52+01:00 2023-07-18T14:00:00+01:00 2024-06-05T09:00:00+01:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-4 48W00000DBAWO-4D
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008255_030 Dismissed Planned Production unavailability 2024-03-22T08:15:38+00:00 2023-07-18T14:00:00+01:00 2024-06-05T09:00:00+01:00 MW 153 0 153 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-4 48W00000DBAWO-4D
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008255_029 Dismissed Planned Production unavailability 2024-03-22T07:33:33+00:00 2023-07-18T14:00:00+01:00 2024-06-12T09:00:00+01:00 MW 153 0 153 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-4 48W00000DBAWO-4D
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008255_028 Dismissed Planned Production unavailability 2024-03-19T12:10:38+00:00 2023-07-18T14:00:00+01:00 2024-06-03T09:00:00+01:00 MW 153 0 153 Shutdown
Planned Outage
Wind Offshore 10YGB----------A