Last update at: 2024-03-28T09:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008970_001 | Active | Unplanned | Production unavailability | 2024-03-28T09:26:53+00:00 | 2024-03-28T09:25:00+00:00 | 2024-03-28T15:20:00+00:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008969_002 | Inactive | Unplanned | Consumption unavailability | 2024-03-28T01:47:32+00:00 | 2024-03-27T23:50:00+00:00 | 2024-03-28T00:33:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008969_001 | Dismissed | Unplanned | Consumption unavailability | 2024-03-28T00:27:33+00:00 | 2024-03-27T23:50:00+00:00 | 2024-03-28T00:33:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008968_001 | Active | Planned | Production unavailability | 2024-03-27T16:10:27+00:00 | 2025-06-21T09:00:00+01:00 | 2025-06-28T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008967_001 | Active | Planned | Production unavailability | 2024-03-27T16:08:25+00:00 | 2025-06-14T09:00:00+01:00 | 2025-06-21T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008966_001 | Active | Planned | Production unavailability | 2024-03-27T16:04:44+00:00 | 2025-05-17T09:00:00+01:00 | 2025-05-31T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008965_001 | Active | Planned | Production unavailability | 2024-03-27T16:02:34+00:00 | 2025-05-17T09:00:00+01:00 | 2025-05-31T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008642_002 | Active | Planned | Production unavailability | 2024-03-27T15:23:48+00:00 | 2024-07-08T09:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008642_001 | Dismissed | Planned | Production unavailability | 2023-11-27T12:37:44+00:00 | 2024-07-06T09:00:00+01:00 | 2024-07-12T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_002 | Active | Planned | Production unavailability | 2024-03-27T15:22:28+00:00 | 2024-07-08T09:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_001 | Dismissed | Planned | Production unavailability | 2024-02-09T09:42:37+00:00 | 2024-06-29T09:00:00+01:00 | 2024-07-05T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008962_002 | Inactive | Unplanned | Production unavailability | 2024-03-27T13:02:31+00:00 | 2024-03-27T11:32:00+00:00 | 2024-03-27T11:54:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008963_002 | Inactive | Unplanned | Consumption unavailability | 2024-03-27T13:02:31+00:00 | 2024-03-27T11:48:00+00:00 | 2024-03-27T11:55:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008963_001 | Dismissed | Unplanned | Consumption unavailability | 2024-03-27T11:54:15+00:00 | 2024-03-27T11:48:00+00:00 | 2024-03-27T11:55:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008962_001 | Dismissed | Unplanned | Production unavailability | 2024-03-27T11:52:54+00:00 | 2024-03-27T11:32:00+00:00 | 2024-03-27T11:54:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Control System |
Hydro Pumped Storage | 10YGB----------A |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008641_001 | Dismissed | Planned | Production unavailability | 2023-11-27T12:35:21+00:00 | 2024-06-29T09:00:00+01:00 | 2024-07-05T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_008 | Dismissed | Planned | Production unavailability | 2024-03-25T14:21:18+00:00 | 2024-03-18T08:00:00+00:00 | 2024-03-27T17:00:00+00:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_007 | Dismissed | Planned | Production unavailability | 2024-03-22T08:14:22+00:00 | 2024-03-18T08:00:00+00:00 | 2024-03-26T16:00:00+00:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_006 | Dismissed | Planned | Production unavailability | 2024-03-22T07:32:06+00:00 | 2024-03-18T08:00:00+00:00 | 2024-03-26T15:00:00+00:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_005 | Dismissed | Planned | Production unavailability | 2024-03-19T12:08:19+00:00 | 2024-03-18T08:00:00+00:00 | 2024-03-25T10:10:00+00:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_003 | Dismissed | Planned | Production unavailability | 2024-03-17T17:49:29+00:00 | 2024-03-18T08:00:00+00:00 | 2024-03-25T10:10:00+00:00 | MW | 26 | 0 | 26 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_002 | Dismissed | Planned | Production unavailability | 2024-02-14T16:00:30+00:00 | 2024-03-18T08:00:00+00:00 | 2024-03-25T10:10:00+00:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008829_001 | Dismissed | Planned | Production unavailability | 2024-02-02T10:12:16+00:00 | 2024-02-19T08:00:00+00:00 | 2024-02-26T10:10:00+00:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008960_002 | Inactive | Planned | Production unavailability | 2024-03-27T00:02:32+00:00 | 2024-03-26T19:30:00+00:00 | 2024-03-26T23:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008960_001 | Dismissed | Planned | Production unavailability | 2024-03-26T18:55:45+00:00 | 2024-03-26T19:30:00+00:00 | 2024-03-26T23:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008956_005 | Inactive | Planned | Consumption unavailability | 2024-03-24T16:02:32+00:00 | 2024-03-22T16:35:00+00:00 | 2024-03-24T15:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008956_004 | Dismissed | Planned | Consumption unavailability | 2024-03-24T05:22:20+00:00 | 2024-03-22T16:35:00+00:00 | 2024-03-24T15:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008956_003 | Dismissed | Planned | Consumption unavailability | 2024-03-23T21:47:20+00:00 | 2024-03-22T16:35:00+00:00 | 2024-03-24T10:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008956_002 | Dismissed | Planned | Consumption unavailability | 2024-03-23T08:02:38+00:00 | 2024-03-22T16:35:00+00:00 | 2024-03-23T23:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008959_002 | Inactive | Planned | Consumption unavailability | 2024-03-24T16:02:32+00:00 | 2024-03-24T06:08:00+00:00 | 2024-03-24T15:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008959_001 | Dismissed | Planned | Consumption unavailability | 2024-03-24T05:21:51+00:00 | 2024-03-24T06:08:00+00:00 | 2024-03-24T15:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008956_001 | Dismissed | Planned | Consumption unavailability | 2024-03-22T16:29:45+00:00 | 2024-03-22T16:35:00+00:00 | 2024-03-23T10:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008958_003 | Inactive | Planned | Consumption unavailability | 2024-03-24T00:02:32+00:00 | 2024-03-22T17:45:00+00:00 | 2024-03-23T23:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008958_002 | Dismissed | Planned | Consumption unavailability | 2024-03-23T08:02:15+00:00 | 2024-03-22T17:45:00+00:00 | 2024-03-23T23:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008958_001 | Dismissed | Planned | Consumption unavailability | 2024-03-22T17:46:55+00:00 | 2024-03-22T17:45:00+00:00 | 2024-03-23T10:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008885_003 | Dismissed | Planned | Production unavailability | 2024-03-22T15:05:23+00:00 | 2024-03-25T07:00:00+00:00 | 2024-03-25T11:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008885_002 | Dismissed | Planned | Production unavailability | 2024-02-27T08:23:14+00:00 | 2024-03-25T07:00:00+00:00 | 2024-03-25T11:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008885_001 | Dismissed | Planned | Production unavailability | 2024-02-27T08:11:26+00:00 | 2024-03-25T08:00:00+00:00 | 2024-03-25T11:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008884_004 | Dismissed | Planned | Production unavailability | 2024-03-22T15:04:49+00:00 | 2024-03-25T07:00:00+00:00 | 2024-03-25T11:00:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008884_003 | Dismissed | Planned | Production unavailability | 2024-02-27T08:23:40+00:00 | 2024-03-25T07:00:00+00:00 | 2024-03-25T11:00:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008884_002 | Dismissed | Planned | Production unavailability | 2024-02-27T08:11:44+00:00 | 2024-03-25T08:00:00+00:00 | 2024-03-25T11:00:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008954_003 | Inactive | Planned | Consumption unavailability | 2024-03-22T15:02:32+00:00 | 2024-03-22T09:00:00+00:00 | 2024-03-22T14:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008954_002 | Dismissed | Planned | Consumption unavailability | 2024-03-22T11:38:16+00:00 | 2024-03-22T09:00:00+00:00 | 2024-03-22T14:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008954_001 | Dismissed | Planned | Consumption unavailability | 2024-03-22T06:43:27+00:00 | 2024-03-22T09:00:00+00:00 | 2024-03-22T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_003 | Dismissed | Planned | Production unavailability | 2024-03-22T11:46:50+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:30:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_002 | Dismissed | Planned | Production unavailability | 2024-03-22T11:10:29+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:30:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_001 | Dismissed | Planned | Production unavailability | 2024-03-22T10:24:43+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_030 | Active | Planned | Production unavailability | 2024-03-22T08:16:23+00:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T10:00:00+00:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_029 | Dismissed | Planned | Production unavailability | 2024-03-22T07:35:55+00:00 | 2023-07-18T14:00:00+01:00 | 2024-11-11T09:00:00+00:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_028 | Dismissed | Planned | Production unavailability | 2024-03-22T07:33:55+00:00 | 2023-07-18T14:00:00+01:00 | 2025-01-08T09:00:00+00:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |