Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 182 183 184 185 186 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007155_002 Dismissed Planned Production unavailability 2022-06-06T18:07:29+01:00 2022-06-06T18:36:00+01:00 2022-06-07T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007155_001 Dismissed Planned Production unavailability 2022-06-05T17:27:30+01:00 2022-06-06T18:00:00+01:00 2022-06-07T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007161_003 Dismissed Planned Production unavailability 2022-06-07T08:31:16+01:00 2022-06-07T10:20:00+01:00 2022-06-07T11:00:00+01:00 MW 623 270 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007161_002 Dismissed Planned Production unavailability 2022-06-07T06:46:39+01:00 2022-06-07T10:20:00+01:00 2022-06-07T11:00:00+01:00 MW 623 270 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007161_001 Dismissed Planned Production unavailability 2022-06-06T20:10:17+01:00 2022-06-07T10:30:00+01:00 2022-06-07T11:00:00+01:00 MW 621 272 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007141_002 Inactive Planned Production unavailability 2022-06-07T08:01:53+01:00 2022-06-06T19:00:00+01:00 2022-06-07T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007141_001 Dismissed Planned Production unavailability 2022-06-01T12:59:17+01:00 2022-06-06T19:00:00+01:00 2022-06-07T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007156_003 Inactive Planned Production unavailability 2022-06-06T13:01:53+01:00 2022-06-06T11:30:00+01:00 2022-06-06T12:01:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007157_003 Inactive Planned Consumption unavailability 2022-06-06T13:01:53+01:00 2022-06-06T11:30:00+01:00 2022-06-06T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007157_002 Dismissed Planned Consumption unavailability 2022-06-06T11:59:43+01:00 2022-06-06T11:30:00+01:00 2022-06-06T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007156_002 Dismissed Planned Production unavailability 2022-06-06T12:00:12+01:00 2022-06-06T11:30:00+01:00 2022-06-06T12:01:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007156_001 Dismissed Planned Production unavailability 2022-06-06T11:04:30+01:00 2022-06-06T11:30:00+01:00 2022-06-06T12:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007157_001 Dismissed Planned Consumption unavailability 2022-06-06T11:05:46+01:00 2022-06-06T11:30:00+01:00 2022-06-06T12:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007140_006 Inactive Planned Production unavailability 2022-06-06T10:01:53+01:00 2022-06-05T17:30:00+01:00 2022-06-06T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007140_005 Dismissed Planned Production unavailability 2022-06-06T07:37:25+01:00 2022-06-05T17:30:00+01:00 2022-06-06T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007140_004 Dismissed Planned Production unavailability 2022-06-05T17:12:21+01:00 2022-06-05T17:30:00+01:00 2022-06-06T08:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007140_003 Dismissed Planned Production unavailability 2022-06-05T17:10:00+01:00 2022-06-05T17:30:00+01:00 2022-06-06T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007140_002 Dismissed Planned Production unavailability 2022-06-04T21:43:38+01:00 2022-06-05T18:00:00+01:00 2022-06-06T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007140_001 Dismissed Planned Production unavailability 2022-06-01T12:56:55+01:00 2022-06-05T19:00:00+01:00 2022-06-06T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007125_007 Inactive Planned Production unavailability 2022-06-05T12:01:53+01:00 2022-06-04T19:00:00+01:00 2022-06-05T11:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007125_006 Dismissed Planned Production unavailability 2022-06-04T21:40:04+01:00 2022-06-04T19:00:00+01:00 2022-06-05T11:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007125_005 Dismissed Planned Production unavailability 2022-06-04T15:19:31+01:00 2022-06-04T19:00:00+01:00 2022-06-05T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007125_004 Dismissed Planned Production unavailability 2022-06-03T23:28:16+01:00 2022-06-04T19:00:00+01:00 2022-06-05T06:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007125_003 Dismissed Planned Production unavailability 2022-06-01T13:36:30+01:00 2022-06-04T22:00:00+01:00 2022-06-05T06:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007125_002 Dismissed Planned Production unavailability 2022-06-01T11:59:34+01:00 2022-06-04T22:00:00+01:00 2022-06-05T06:30:00+01:00 MW 247 646 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007125_001 Dismissed Planned Production unavailability 2022-05-27T22:02:58+01:00 2022-06-04T22:00:00+01:00 2022-06-05T06:30:00+01:00 MW 247 620 867 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000006898_006 Inactive Planned Production unavailability 2022-06-04T19:01:53+01:00 2022-05-30T08:30:00+01:00 2022-06-04T18:00:00+01:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000006898_005 Dismissed Planned Production unavailability 2022-06-03T17:10:29+01:00 2022-05-30T08:30:00+01:00 2022-06-04T18:00:00+01:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000006898_004 Dismissed Planned Production unavailability 2022-05-24T11:53:46+01:00 2022-05-30T08:30:00+01:00 2022-06-04T17:00:00+01:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000006898_003 Dismissed Planned Production unavailability 2022-04-22T09:48:21+01:00 2022-06-13T08:00:00+01:00 2022-06-18T17:00:00+01:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000006898_002 Dismissed Planned Production unavailability 2022-04-22T09:41:20+01:00 2022-06-13T08:00:00+01:00 2022-06-18T00:00:00+01:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000006898_001 Dismissed Planned Production unavailability 2022-04-14T15:33:39+01:00 2022-06-13T08:00:00+01:00 2022-06-17T17:00:00+01:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007124_006 Inactive Planned Production unavailability 2022-06-04T10:01:53+01:00 2022-06-03T19:00:00+01:00 2022-06-04T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007124_005 Dismissed Planned Production unavailability 2022-06-03T23:24:23+01:00 2022-06-03T19:00:00+01:00 2022-06-04T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007124_004 Dismissed Planned Production unavailability 2022-06-02T21:48:53+01:00 2022-06-03T19:00:00+01:00 2022-06-04T06:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007124_003 Dismissed Planned Production unavailability 2022-06-01T13:34:41+01:00 2022-06-03T20:00:00+01:00 2022-06-04T06:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007124_002 Dismissed Planned Production unavailability 2022-06-01T11:59:34+01:00 2022-06-03T20:00:00+01:00 2022-06-04T06:30:00+01:00 MW 247 646 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007124_001 Dismissed Planned Production unavailability 2022-05-27T22:00:50+01:00 2022-06-03T20:00:00+01:00 2022-06-04T06:30:00+01:00 MW 247 620 867 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000006478_006 Inactive Planned Production unavailability 2022-06-03T14:46:53+01:00 2022-06-01T09:00:00+01:00 2022-06-03T13:35:00+01:00 MW 100 0 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000006478_005 Dismissed Planned Production unavailability 2022-06-03T13:27:35+01:00 2022-06-01T09:00:00+01:00 2022-06-03T13:35:00+01:00 MW 100 0 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000006478_004 Dismissed Planned Production unavailability 2022-05-24T14:17:56+01:00 2022-06-01T09:00:00+01:00 2022-06-03T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000006478_003 Dismissed Planned Production unavailability 2022-04-01T10:11:47+01:00 2022-05-27T16:00:00+01:00 2022-05-31T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000006478_002 Dismissed Planned Production unavailability 2022-03-23T10:59:09+00:00 2022-05-21T16:00:00+01:00 2022-05-28T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000006478_001 Dismissed Planned Production unavailability 2021-11-30T16:29:13+00:00 2022-05-21T16:00:00+01:00 2022-05-28T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Testing
Hydro Water Reservoir 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007153_002 Inactive Planned Production unavailability 2022-06-03T12:46:52+01:00 2022-06-03T10:30:00+01:00 2022-06-03T11:35:00+01:00 MW 653 240 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007153_001 Dismissed Planned Production unavailability 2022-06-03T08:51:04+01:00 2022-06-03T10:30:00+01:00 2022-06-03T11:35:00+01:00 MW 653 240 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007152_002 Inactive Planned Production unavailability 2022-06-03T11:31:53+01:00 2022-06-03T10:15:00+01:00 2022-06-03T10:30:00+01:00 MW 873 20 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007154_002 Inactive Planned Production unavailability 2022-06-03T11:31:53+01:00 2022-06-03T10:17:00+01:00 2022-06-03T10:30:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007154_001 Dismissed Planned Production unavailability 2022-06-03T10:18:56+01:00 2022-06-03T10:17:00+01:00 2022-06-03T10:30:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007152_001 Dismissed Planned Production unavailability 2022-06-03T08:43:56+01:00 2022-06-03T10:15:00+01:00 2022-06-03T10:30:00+01:00 MW 873 20 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A