This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2024-09-29T12:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 180 181 182 183 184 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007181_003 Dismissed Planned Production unavailability 2022-06-08T11:06:48+01:00 2022-06-08T12:30:00+01:00 2022-06-08T13:15:00+01:00 MW 462 431 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007181_002 Dismissed Planned Production unavailability 2022-06-08T10:41:03+01:00 2022-06-08T12:30:00+01:00 2022-06-08T13:00:00+01:00 MW 121 772 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007181_001 Dismissed Planned Production unavailability 2022-06-07T17:42:30+01:00 2022-06-08T12:00:00+01:00 2022-06-08T12:30:00+01:00 MW 121 772 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007180_007 Inactive Planned Production unavailability 2022-06-08T13:46:53+01:00 2022-06-08T11:55:00+01:00 2022-06-08T12:45:00+01:00 MW 518 375 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007180_006 Dismissed Planned Production unavailability 2022-06-08T12:35:56+01:00 2022-06-08T11:55:00+01:00 2022-06-08T12:45:00+01:00 MW 518 375 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007180_005 Dismissed Planned Production unavailability 2022-06-08T12:13:17+01:00 2022-06-08T11:55:00+01:00 2022-06-08T12:40:00+01:00 MW 518 375 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007180_004 Dismissed Planned Production unavailability 2022-06-08T11:50:13+01:00 2022-06-08T11:55:00+01:00 2022-06-08T12:30:00+01:00 MW 518 375 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007180_003 Dismissed Planned Production unavailability 2022-06-08T11:47:05+01:00 2022-06-08T11:50:00+01:00 2022-06-08T12:30:00+01:00 MW 518 375 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007180_002 Dismissed Planned Production unavailability 2022-06-08T10:33:00+01:00 2022-06-08T11:45:00+01:00 2022-06-08T12:30:00+01:00 MW 518 375 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007180_001 Dismissed Planned Production unavailability 2022-06-07T17:41:03+01:00 2022-06-08T11:30:00+01:00 2022-06-08T12:00:00+01:00 MW 200 693 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007179_005 Inactive Planned Production unavailability 2022-06-08T13:01:53+01:00 2022-06-08T11:00:00+01:00 2022-06-08T11:55:00+01:00 MW 573 320 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007179_004 Dismissed Planned Production unavailability 2022-06-08T11:50:00+01:00 2022-06-08T11:00:00+01:00 2022-06-08T11:55:00+01:00 MW 573 320 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007179_003 Dismissed Planned Production unavailability 2022-06-08T11:46:51+01:00 2022-06-08T11:00:00+01:00 2022-06-08T11:50:00+01:00 MW 573 320 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007179_002 Dismissed Planned Production unavailability 2022-06-08T10:23:48+01:00 2022-06-08T11:00:00+01:00 2022-06-08T11:45:00+01:00 MW 573 320 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007179_001 Dismissed Planned Production unavailability 2022-06-07T17:38:59+01:00 2022-06-08T11:00:00+01:00 2022-06-08T11:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007178_004 Inactive Planned Production unavailability 2022-06-08T12:01:53+01:00 2022-06-08T10:15:00+01:00 2022-06-08T11:00:00+01:00 MW 626 267 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007178_003 Dismissed Planned Production unavailability 2022-06-08T09:54:45+01:00 2022-06-08T10:15:00+01:00 2022-06-08T11:00:00+01:00 MW 626 267 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007178_002 Dismissed Planned Production unavailability 2022-06-08T09:54:24+01:00 2022-06-08T10:15:00+01:00 2022-06-08T11:00:00+01:00 MW 267 626 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007178_001 Dismissed Planned Production unavailability 2022-06-07T17:37:46+01:00 2022-06-08T10:30:00+01:00 2022-06-08T11:00:00+01:00 MW 352 541 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007177_005 Inactive Planned Production unavailability 2022-06-08T11:16:53+01:00 2022-06-08T10:00:00+01:00 2022-06-08T10:15:00+01:00 MW 654 239 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007177_004 Dismissed Planned Production unavailability 2022-06-08T09:52:37+01:00 2022-06-08T10:00:00+01:00 2022-06-08T10:15:00+01:00 MW 654 239 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007177_003 Dismissed Planned Production unavailability 2022-06-08T09:45:06+01:00 2022-06-08T10:00:00+01:00 2022-06-08T10:15:00+01:00 MW 666 227 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007177_002 Dismissed Planned Production unavailability 2022-06-08T08:59:12+01:00 2022-06-08T10:15:00+01:00 2022-06-08T10:30:00+01:00 MW 424 469 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007177_001 Dismissed Planned Production unavailability 2022-06-07T17:36:28+01:00 2022-06-08T10:00:00+01:00 2022-06-08T10:30:00+01:00 MW 424 469 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007176_004 Inactive Planned Production unavailability 2022-06-08T11:01:53+01:00 2022-06-08T09:45:00+01:00 2022-06-08T10:00:00+01:00 MW 682 211 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007176_003 Dismissed Planned Production unavailability 2022-06-08T09:42:48+01:00 2022-06-08T09:45:00+01:00 2022-06-08T10:00:00+01:00 MW 682 211 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007176_002 Dismissed Planned Production unavailability 2022-06-08T08:56:36+01:00 2022-06-08T09:45:00+01:00 2022-06-08T10:15:00+01:00 MW 470 423 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007176_001 Dismissed Planned Production unavailability 2022-06-07T17:34:47+01:00 2022-06-08T09:30:00+01:00 2022-06-08T10:00:00+01:00 MW 470 423 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007175_005 Inactive Planned Production unavailability 2022-06-08T10:46:53+01:00 2022-06-08T09:00:00+01:00 2022-06-08T09:45:00+01:00 MW 708 185 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007175_004 Dismissed Planned Production unavailability 2022-06-08T09:30:04+01:00 2022-06-08T09:00:00+01:00 2022-06-08T09:45:00+01:00 MW 708 185 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007175_003 Dismissed Planned Production unavailability 2022-06-08T08:54:26+01:00 2022-06-08T09:00:00+01:00 2022-06-08T09:45:00+01:00 MW 643 250 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007175_002 Dismissed Planned Production unavailability 2022-06-08T08:39:28+01:00 2022-06-08T09:00:00+01:00 2022-06-08T09:30:00+01:00 MW 643 250 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007175_001 Dismissed Planned Production unavailability 2022-06-07T17:33:18+01:00 2022-06-08T08:45:00+01:00 2022-06-08T09:30:00+01:00 MW 643 250 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007174_005 Inactive Planned Production unavailability 2022-06-08T10:01:53+01:00 2022-06-07T10:30:00+01:00 2022-06-08T09:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007174_004 Dismissed Planned Production unavailability 2022-06-08T08:40:21+01:00 2022-06-07T10:30:00+01:00 2022-06-08T09:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007174_003 Dismissed Planned Production unavailability 2022-06-07T17:30:43+01:00 2022-06-07T10:30:00+01:00 2022-06-08T08:45:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007174_002 Dismissed Planned Production unavailability 2022-06-07T12:25:02+01:00 2022-06-07T10:30:00+01:00 2022-06-08T08:30:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007174_001 Dismissed Planned Production unavailability 2022-06-07T10:18:44+01:00 2022-06-07T10:30:00+01:00 2022-06-08T09:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007142_002 Dismissed Planned Production unavailability 2022-06-07T17:43:26+01:00 2022-06-07T19:00:00+01:00 2022-06-08T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007142_001 Dismissed Planned Production unavailability 2022-06-01T13:02:14+01:00 2022-06-07T19:00:00+01:00 2022-06-08T07:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000006866_002 Dismissed Planned Production unavailability 2022-06-07T13:44:47+01:00 2022-06-07T08:00:00+01:00 2022-06-08T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000006866_001 Dismissed Planned Production unavailability 2022-03-25T16:04:24+00:00 2022-06-07T08:00:00+01:00 2022-06-08T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
SSE GENERATION
48X000000000077M 0000000000000000000006867_002 Dismissed Planned Production unavailability 2022-06-07T13:44:14+01:00 2022-06-07T08:00:00+01:00 2022-06-08T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
SSE GENERATION
48X000000000077M 0000000000000000000006867_001 Dismissed Planned Production unavailability 2022-03-25T16:05:36+00:00 2022-06-07T08:00:00+01:00 2022-06-08T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
SSE GENERATION
48X000000000077M 0000000000000000000006868_002 Dismissed Planned Production unavailability 2022-06-07T13:43:44+01:00 2022-06-07T08:00:00+01:00 2022-06-08T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
SSE GENERATION
48X000000000077M 0000000000000000000006868_001 Dismissed Planned Production unavailability 2022-03-25T16:06:59+00:00 2022-06-07T08:00:00+01:00 2022-06-08T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007160_007 Inactive Planned Production unavailability 2022-06-07T11:31:54+01:00 2022-06-07T09:43:00+01:00 2022-06-07T10:30:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007160_006 Dismissed Planned Production unavailability 2022-06-07T10:11:33+01:00 2022-06-07T09:43:00+01:00 2022-06-07T10:30:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007160_005 Dismissed Planned Production unavailability 2022-06-07T09:48:51+01:00 2022-06-07T09:43:00+01:00 2022-06-07T10:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007160_004 Dismissed Planned Production unavailability 2022-06-07T09:40:02+01:00 2022-06-07T09:43:00+01:00 2022-06-07T10:04:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A