This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2024-09-29T10:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 178 179 180 181 182 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007205_002 Dismissed Planned Production unavailability 2022-06-09T08:35:27+01:00 2022-06-09T10:30:00+01:00 2022-06-09T11:15:00+01:00 MW 679 214 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007204_002 Dismissed Planned Production unavailability 2022-06-09T09:46:07+01:00 2022-06-09T10:20:00+01:00 2022-06-09T10:29:00+01:00 MW 736 157 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007204_001 Dismissed Planned Production unavailability 2022-06-08T23:24:50+01:00 2022-06-09T10:00:00+01:00 2022-06-09T10:29:00+01:00 MW 736 157 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007205_001 Dismissed Planned Production unavailability 2022-06-08T23:27:36+01:00 2022-06-09T10:30:00+01:00 2022-06-09T10:59:00+01:00 MW 676 217 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007208_002 Dismissed Planned Production unavailability 2022-06-09T11:44:06+01:00 2022-06-09T12:30:00+01:00 2022-06-09T12:59:00+01:00 MW 372 521 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007208_001 Dismissed Planned Production unavailability 2022-06-08T23:35:48+01:00 2022-06-09T12:30:00+01:00 2022-06-09T12:59:00+01:00 MW 372 521 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007203_004 Inactive Planned Production unavailability 2022-06-09T11:31:54+01:00 2022-06-09T09:40:00+01:00 2022-06-09T10:20:00+01:00 MW 791 102 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007203_003 Dismissed Planned Production unavailability 2022-06-09T09:45:09+01:00 2022-06-09T09:40:00+01:00 2022-06-09T10:20:00+01:00 MW 791 102 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007203_002 Dismissed Planned Production unavailability 2022-06-09T09:28:52+01:00 2022-06-09T09:40:00+01:00 2022-06-09T09:59:00+01:00 MW 791 102 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007203_001 Dismissed Planned Production unavailability 2022-06-08T23:22:27+01:00 2022-06-09T09:30:00+01:00 2022-06-09T09:59:00+01:00 MW 791 102 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007202_003 Inactive Planned Production unavailability 2022-06-09T10:46:54+01:00 2022-06-09T09:00:00+01:00 2022-06-09T09:40:00+01:00 MW 851 42 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007202_002 Dismissed Planned Production unavailability 2022-06-09T09:28:14+01:00 2022-06-09T09:00:00+01:00 2022-06-09T09:40:00+01:00 MW 851 42 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007202_001 Dismissed Planned Production unavailability 2022-06-08T23:20:15+01:00 2022-06-09T09:00:00+01:00 2022-06-09T09:29:00+01:00 MW 851 42 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007206_003 Dismissed Planned Production unavailability 2022-06-09T10:41:32+01:00 2022-06-09T11:15:00+01:00 2022-06-09T11:29:00+01:00 MW 517 376 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007206_002 Dismissed Planned Production unavailability 2022-06-09T08:37:24+01:00 2022-06-09T11:15:00+01:00 2022-06-09T11:29:00+01:00 MW 517 376 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007206_001 Dismissed Planned Production unavailability 2022-06-08T23:29:57+01:00 2022-06-09T11:00:00+01:00 2022-06-09T11:29:00+01:00 MW 517 376 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007201_002 Inactive Planned Production unavailability 2022-06-09T10:01:52+01:00 2022-06-09T08:30:00+01:00 2022-06-09T08:59:00+01:00 MW 876 17 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007201_001 Dismissed Planned Production unavailability 2022-06-08T23:17:44+01:00 2022-06-09T08:30:00+01:00 2022-06-09T08:59:00+01:00 MW 876 17 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007200_002 Inactive Planned Production unavailability 2022-06-09T09:31:52+01:00 2022-06-09T08:00:00+01:00 2022-06-09T08:29:00+01:00 MW 656 237 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007200_001 Dismissed Planned Production unavailability 2022-06-08T23:15:15+01:00 2022-06-09T08:00:00+01:00 2022-06-09T08:29:00+01:00 MW 656 237 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007199_002 Inactive Planned Production unavailability 2022-06-09T09:01:53+01:00 2022-06-09T07:30:00+01:00 2022-06-09T07:59:00+01:00 MW 500 393 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007199_001 Dismissed Planned Production unavailability 2022-06-08T23:12:06+01:00 2022-06-09T07:30:00+01:00 2022-06-09T07:59:00+01:00 MW 500 393 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007198_005 Inactive Planned Production unavailability 2022-06-09T08:31:53+01:00 2022-06-08T19:50:00+01:00 2022-06-09T07:30:00+01:00 MW 394 499 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007198_004 Dismissed Planned Production unavailability 2022-06-08T20:12:58+01:00 2022-06-08T19:50:00+01:00 2022-06-09T07:30:00+01:00 MW 394 499 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007198_003 Dismissed Planned Production unavailability 2022-06-08T20:02:45+01:00 2022-06-08T19:50:00+01:00 2022-06-09T07:30:00+01:00 MW 401 492 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007198_002 Dismissed Planned Production unavailability 2022-06-08T19:05:51+01:00 2022-06-08T19:50:00+01:00 2022-06-09T07:30:00+01:00 MW 377 516 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007198_001 Dismissed Planned Production unavailability 2022-06-08T18:43:09+01:00 2022-06-08T19:50:00+01:00 2022-06-09T08:30:00+01:00 MW 377 516 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007144_002 Dismissed Planned Production unavailability 2022-06-08T23:07:31+01:00 2022-06-09T18:00:00+01:00 2022-06-10T10:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007144_001 Dismissed Planned Production unavailability 2022-06-01T13:07:59+01:00 2022-06-09T18:00:00+01:00 2022-06-10T10:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007143_003 Dismissed Planned Production unavailability 2022-06-08T23:06:02+01:00 2022-06-08T19:30:00+01:00 2022-06-09T10:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007143_002 Dismissed Planned Production unavailability 2022-06-07T17:43:59+01:00 2022-06-08T19:30:00+01:00 2022-06-09T10:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007143_001 Dismissed Planned Production unavailability 2022-06-01T13:05:12+01:00 2022-06-08T19:00:00+01:00 2022-06-09T10:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007197_002 Inactive Planned Production unavailability 2022-06-08T21:01:55+01:00 2022-06-08T19:34:00+01:00 2022-06-08T19:49:00+01:00 MW 590 303 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007197_001 Dismissed Planned Production unavailability 2022-06-08T18:39:21+01:00 2022-06-08T19:34:00+01:00 2022-06-08T19:49:00+01:00 MW 590 303 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007196_002 Inactive Planned Production unavailability 2022-06-08T20:46:55+01:00 2022-06-08T19:19:00+01:00 2022-06-08T19:33:00+01:00 MW 519 374 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007196_001 Dismissed Planned Production unavailability 2022-06-08T18:36:23+01:00 2022-06-08T19:19:00+01:00 2022-06-08T19:33:00+01:00 MW 519 374 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007195_002 Inactive Planned Production unavailability 2022-06-08T20:31:55+01:00 2022-06-08T19:03:00+01:00 2022-06-08T19:18:00+01:00 MW 448 445 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007195_001 Dismissed Planned Production unavailability 2022-06-08T18:33:18+01:00 2022-06-08T19:03:00+01:00 2022-06-08T19:18:00+01:00 MW 448 445 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007193_003 Inactive Planned Production unavailability 2022-06-08T20:16:54+01:00 2022-06-08T18:46:00+01:00 2022-06-08T19:02:00+01:00 MW 377 516 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007193_002 Dismissed Planned Production unavailability 2022-06-08T18:30:13+01:00 2022-06-08T18:46:00+01:00 2022-06-08T19:02:00+01:00 MW 377 516 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007193_001 Dismissed Planned Production unavailability 2022-06-08T18:17:42+01:00 2022-06-08T19:00:00+01:00 2022-06-08T19:21:00+01:00 MW 377 516 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007192_004 Inactive Planned Production unavailability 2022-06-08T19:46:54+01:00 2022-06-08T18:30:00+01:00 2022-06-08T18:46:00+01:00 MW 307 586 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007192_003 Dismissed Planned Production unavailability 2022-06-08T18:26:45+01:00 2022-06-08T18:30:00+01:00 2022-06-08T18:46:00+01:00 MW 307 586 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007192_002 Dismissed Planned Production unavailability 2022-06-08T18:23:46+01:00 2022-06-08T18:30:00+01:00 2022-06-08T18:59:00+01:00 MW 307 586 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007191_002 Inactive Planned Production unavailability 2022-06-08T19:46:54+01:00 2022-06-08T18:15:00+01:00 2022-06-08T18:37:00+01:00 MW 236 657 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007191_001 Dismissed Planned Production unavailability 2022-06-08T18:00:10+01:00 2022-06-08T18:15:00+01:00 2022-06-08T18:37:00+01:00 MW 236 657 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007192_001 Dismissed Planned Production unavailability 2022-06-08T18:15:16+01:00 2022-06-08T18:38:00+01:00 2022-06-08T18:59:00+01:00 MW 307 586 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007190_003 Inactive Planned Production unavailability 2022-06-08T19:16:54+01:00 2022-06-08T17:50:00+01:00 2022-06-08T18:15:00+01:00 MW 173 720 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007190_002 Dismissed Planned Production unavailability 2022-06-08T17:56:48+01:00 2022-06-08T17:50:00+01:00 2022-06-08T18:15:00+01:00 MW 173 720 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007190_001 Dismissed Planned Production unavailability 2022-06-08T17:43:52+01:00 2022-06-08T17:50:00+01:00 2022-06-08T18:10:00+01:00 MW 173 720 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A