Last update at: 2024-09-27T06:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 128 129 130 131 132 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007793_005 Dismissed Planned Production unavailability 2023-01-23T18:49:54+00:00 2023-01-24T12:30:00+00:00 2023-01-24T15:30:00+00:00 MW 250 643 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007793_004 Dismissed Planned Production unavailability 2023-01-18T11:43:22+00:00 2023-01-24T13:00:00+00:00 2023-01-24T17:30:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007793_003 Dismissed Planned Production unavailability 2022-12-29T16:40:25+00:00 2023-01-26T13:00:00+00:00 2023-01-26T17:30:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007793_002 Dismissed Planned Production unavailability 2022-12-19T16:34:25+00:00 2023-01-26T11:30:00+00:00 2023-01-28T11:00:00+00:00 MW 59 834 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007793_001 Dismissed Planned Production unavailability 2022-12-19T16:24:24+00:00 2023-01-26T11:30:00+00:00 2023-01-28T11:00:00+00:00 MW 20 873 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007883_003 Inactive Planned Production unavailability 2023-01-24T11:02:31+00:00 2023-01-24T09:30:00+00:00 2023-01-24T10:00:00+00:00 MW 329 564 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007883_002 Dismissed Planned Production unavailability 2023-01-24T07:03:46+00:00 2023-01-24T09:30:00+00:00 2023-01-24T10:00:00+00:00 MW 329 564 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007883_001 Dismissed Planned Production unavailability 2023-01-23T18:48:13+00:00 2023-01-24T09:00:00+00:00 2023-01-24T12:30:00+00:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007882_003 Inactive Planned Production unavailability 2023-01-24T10:32:31+00:00 2023-01-24T09:00:00+00:00 2023-01-24T09:30:00+00:00 MW 250 643 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007882_002 Dismissed Planned Production unavailability 2023-01-24T07:02:42+00:00 2023-01-24T09:00:00+00:00 2023-01-24T09:30:00+00:00 MW 250 643 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007882_001 Dismissed Planned Production unavailability 2023-01-23T18:45:52+00:00 2023-01-24T08:30:00+00:00 2023-01-24T09:00:00+00:00 MW 250 643 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_010 Inactive Planned Production unavailability 2023-01-24T10:02:31+00:00 2023-01-23T22:00:00+00:00 2023-01-24T09:00:00+00:00 MW 267 626 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_009 Dismissed Planned Production unavailability 2023-01-24T07:04:32+00:00 2023-01-23T22:00:00+00:00 2023-01-24T09:00:00+00:00 MW 267 626 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_008 Dismissed Planned Production unavailability 2023-01-23T21:54:52+00:00 2023-01-23T22:00:00+00:00 2023-01-24T08:30:00+00:00 MW 267 626 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_007 Dismissed Planned Production unavailability 2023-01-23T18:43:25+00:00 2023-01-23T22:00:00+00:00 2023-01-24T08:30:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_006 Dismissed Planned Production unavailability 2023-01-23T16:37:19+00:00 2023-01-23T22:00:00+00:00 2023-01-24T10:00:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_005 Dismissed Planned Production unavailability 2023-01-22T21:31:00+00:00 2023-01-23T19:00:00+00:00 2023-01-24T10:00:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_004 Dismissed Planned Production unavailability 2023-01-22T21:28:16+00:00 2023-01-23T19:00:00+00:00 2023-01-24T09:00:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_003 Dismissed Planned Production unavailability 2023-01-18T11:34:26+00:00 2023-01-23T20:00:00+00:00 2023-01-24T09:00:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_002 Dismissed Planned Production unavailability 2022-12-29T16:27:44+00:00 2023-01-25T20:00:00+00:00 2023-01-26T09:00:00+00:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007791_001 Dismissed Planned Production unavailability 2022-12-19T16:14:52+00:00 2023-01-25T21:00:00+00:00 2023-01-26T05:30:00+00:00 MW 59 834 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_010 Inactive Planned Consumption unavailability 2023-01-24T04:02:31+00:00 2023-01-22T06:45:00+00:00 2023-01-24T03:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_009 Dismissed Planned Consumption unavailability 2023-01-23T19:44:01+00:00 2023-01-22T06:45:00+00:00 2023-01-24T03:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_008 Dismissed Planned Consumption unavailability 2023-01-23T16:57:31+00:00 2023-01-22T06:45:00+00:00 2023-01-23T21:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_007 Dismissed Planned Consumption unavailability 2023-01-23T12:43:44+00:00 2023-01-22T06:45:00+00:00 2023-01-23T18:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_006 Dismissed Planned Consumption unavailability 2023-01-23T10:01:16+00:00 2023-01-22T06:45:00+00:00 2023-01-23T13:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_005 Dismissed Planned Consumption unavailability 2023-01-23T04:37:06+00:00 2023-01-22T06:45:00+00:00 2023-01-23T10:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_004 Dismissed Planned Consumption unavailability 2023-01-22T20:14:23+00:00 2023-01-22T06:45:00+00:00 2023-01-23T05:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_003 Dismissed Planned Consumption unavailability 2023-01-22T15:58:15+00:00 2023-01-22T06:45:00+00:00 2023-01-22T20:30:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_002 Dismissed Planned Consumption unavailability 2023-01-22T09:50:00+00:00 2023-01-22T06:45:00+00:00 2023-01-22T16:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007864_001 Dismissed Planned Consumption unavailability 2023-01-22T04:37:50+00:00 2023-01-22T06:45:00+00:00 2023-01-22T12:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000007884_002 Inactive Planned Production unavailability 2023-01-24T03:47:31+00:00 2023-01-23T22:26:00+00:00 2023-01-24T02:36:00+00:00 MW 710 0 710 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000007884_001 Dismissed Planned Production unavailability 2023-01-23T20:15:23+00:00 2023-01-23T22:26:00+00:00 2023-01-24T02:36:00+00:00 MW 710 0 710 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007874_005 Inactive Planned Consumption unavailability 2023-01-24T00:02:31+00:00 2023-01-23T10:07:00+00:00 2023-01-23T23:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007874_004 Dismissed Planned Consumption unavailability 2023-01-23T19:42:51+00:00 2023-01-23T10:07:00+00:00 2023-01-23T23:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007874_003 Dismissed Planned Consumption unavailability 2023-01-23T16:58:27+00:00 2023-01-23T10:07:00+00:00 2023-01-23T21:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007874_002 Dismissed Planned Consumption unavailability 2023-01-23T12:44:21+00:00 2023-01-23T10:07:00+00:00 2023-01-23T18:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007874_001 Dismissed Planned Consumption unavailability 2023-01-23T10:08:19+00:00 2023-01-23T10:07:00+00:00 2023-01-23T13:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000007873_003 Inactive Planned Production unavailability 2023-01-23T23:32:31+00:00 2023-01-23T06:20:00+00:00 2023-01-23T22:26:00+00:00 MW 370 340 710 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000007873_002 Dismissed Planned Production unavailability 2023-01-23T20:11:16+00:00 2023-01-23T06:20:00+00:00 2023-01-23T22:26:00+00:00 MW 370 340 710 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000007873_001 Dismissed Planned Production unavailability 2023-01-23T05:24:41+00:00 2023-01-23T06:20:00+00:00 2023-01-23T23:59:00+00:00 MW 370 340 710 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007881_002 Inactive Planned Production unavailability 2023-01-23T23:02:31+00:00 2023-01-23T21:30:00+00:00 2023-01-23T22:00:00+00:00 MW 243 650 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007881_001 Dismissed Planned Production unavailability 2023-01-23T16:44:10+00:00 2023-01-23T21:30:00+00:00 2023-01-23T22:00:00+00:00 MW 243 650 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007880_002 Inactive Planned Production unavailability 2023-01-23T22:32:31+00:00 2023-01-23T21:00:00+00:00 2023-01-23T21:30:00+00:00 MW 164 729 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007880_001 Dismissed Planned Production unavailability 2023-01-23T16:41:20+00:00 2023-01-23T21:00:00+00:00 2023-01-23T21:30:00+00:00 MW 164 729 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007792_004 Dismissed Planned Production unavailability 2023-01-23T18:51:06+00:00 2023-01-24T09:00:00+00:00 2023-01-24T13:00:00+00:00 MW 846 47 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007792_003 Dismissed Planned Production unavailability 2023-01-18T11:41:32+00:00 2023-01-24T09:00:00+00:00 2023-01-24T13:00:00+00:00 MW 846 47 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007792_002 Dismissed Planned Production unavailability 2022-12-29T16:37:42+00:00 2023-01-26T09:00:00+00:00 2023-01-26T13:00:00+00:00 MW 846 47 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007792_001 Dismissed Planned Production unavailability 2022-12-19T16:21:05+00:00 2023-01-26T05:30:00+00:00 2023-01-26T11:30:00+00:00 MW 480 413 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007879_002 Inactive Planned Production unavailability 2023-01-23T18:17:31+00:00 2023-01-23T16:30:00+00:00 2023-01-23T17:00:00+00:00 MW 263 630 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A